2024 May 02
Agenda:
- General TDAQ Project status updates/Schedule review.
- Status of DAQ room and AL9 transition, EPICS, Optical fiber plant, Test stands (IERC), and Server purchase.
- AOB
Eric -- Focusing on AL9 and Spack. Updated crontabs so temperature errors go to slack #daq_alarms now (occasional disconnects only at IERC, they run every 5 minutes, errors are 1 per day/ per sever or less; possibly connecting to DAQ room EPICS).
George -- Provided feedback on Optical Feedthrough quote request.
Antonio -- working on Run Conditions db dump handling.Then will study KAFKA.
Ryan -- Getting back to CFO firmware, for GR2 we want CFO event record. Looking at AL9. Push on the Optical Feedthrough.
Mike -- Eager to measure power consumption of mu2edaq20 (with 2 DTCs) at Sidet in high usage mode. Worked out path forward at IERC with Networking ordering/installing a cable tray for us on TDAQ Controls above both racks.
Giani -- Working on setting up ots spack Trigger system on mu2e-trk-01/02 AL9 nodes in DAQ room. June 12th week will be here. Can schedule SLAM (for Sidet, IERC, Wideband) for this week and Giani can help. Cleanup DAQ room instructions in advance of 12-June.
Lei -- Simon presented a 300us Latency for Data Tag retrieval. What can be pipelined? Can Prefetch help? Can off-spill be handled as an independent stream?