Skip to content

Add --test-workspace and --test-packages #1629

Add --test-workspace and --test-packages

Add --test-workspace and --test-packages #1629

Triggered via pull request November 9, 2024 18:33
Status Failure
Total duration 4m 39s
Artifacts 4

tests.yml

on: pull_request
release-binary
31s
release-binary
Matrix: test
Spell check with Typos
6s
Spell check with Typos
Matrix: install
Matrix: maximal-versions
Matrix: minimal-versions
Matrix: tests-from-tarball
Matrix: pr-mutants
Matrix: cargo-mutants
Fit to window
Zoom out
Zoom in

Annotations

31 errors
minimal-versions (ubuntu-latest)
Process completed with exit code 101.
test (ubuntu-latest, nightly)
Process completed with exit code 101.
minimal-versions (windows-latest)
The job was canceled because "ubuntu-latest" failed.
minimal-versions (windows-latest)
The operation was canceled.
test (windows-latest, nightly)
The job was canceled because "ubuntu-latest_nightly" failed.
test (windows-latest, nightly)
The operation was canceled.
test (windows-latest, 1.74)
The job was canceled because "ubuntu-latest_nightly" failed.
test (windows-latest, 1.74)
The operation was canceled.
maximal-versions (ubuntu-latest)
Process completed with exit code 101.
test (windows-latest, stable)
The job was canceled because "ubuntu-latest_nightly" failed.
test (windows-latest, stable)
The operation was canceled.
maximal-versions (windows-latest)
The job was canceled because "ubuntu-latest" failed.
maximal-versions (windows-latest)
The operation was canceled.
test (ubuntu-latest, stable)
The job was canceled because "ubuntu-latest_nightly" failed.
test (ubuntu-latest, stable)
The operation was canceled.
minimal-versions (macOS-latest)
The job was canceled because "ubuntu-latest" failed.
minimal-versions (macOS-latest)
The operation was canceled.
test (macOS-latest, stable)
The job was canceled because "ubuntu-latest_nightly" failed.
test (macOS-latest, stable)
The operation was canceled.
test (macOS-latest, nightly)
The job was canceled because "ubuntu-latest_nightly" failed.
test (macOS-latest, nightly)
The operation was canceled.
test (ubuntu-latest, 1.74)
The job was canceled because "ubuntu-latest_nightly" failed.
test (ubuntu-latest, 1.74)
The operation was canceled.
test (macOS-latest, 1.74)
The job was canceled because "ubuntu-latest_nightly" failed.
test (macOS-latest, 1.74)
The operation was canceled.
maximal-versions (macOS-latest)
The job was canceled because "ubuntu-latest" failed.
maximal-versions (macOS-latest)
The operation was canceled.
tests-from-tarball (ubuntu-latest)
Process completed with exit code 101.
pr-mutants (nextest)
Process completed with exit code 4.
pr-mutants (cargo)
The job was canceled because "nextest" failed.
pr-mutants (cargo)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
cargo-mutants-linux
3.13 MB
cargo-mutants-package
200 KB
mutants-incremental-cargo.out
30.7 KB
mutants-incremental-nextest.out
11.2 KB