Add --test-workspace and --test-packages #1629
tests.yml
on: pull_request
release-binary
31s
Matrix: test
Spell check with Typos
6s
Matrix: install
Matrix: maximal-versions
Matrix: minimal-versions
Matrix: tests-from-tarball
Matrix: pr-mutants
Matrix: cargo-mutants
Annotations
31 errors
minimal-versions (ubuntu-latest)
Process completed with exit code 101.
|
test (ubuntu-latest, nightly)
Process completed with exit code 101.
|
minimal-versions (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
minimal-versions (windows-latest)
The operation was canceled.
|
test (windows-latest, nightly)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (windows-latest, nightly)
The operation was canceled.
|
test (windows-latest, 1.74)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (windows-latest, 1.74)
The operation was canceled.
|
maximal-versions (ubuntu-latest)
Process completed with exit code 101.
|
test (windows-latest, stable)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (windows-latest, stable)
The operation was canceled.
|
maximal-versions (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
maximal-versions (windows-latest)
The operation was canceled.
|
test (ubuntu-latest, stable)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (ubuntu-latest, stable)
The operation was canceled.
|
minimal-versions (macOS-latest)
The job was canceled because "ubuntu-latest" failed.
|
minimal-versions (macOS-latest)
The operation was canceled.
|
test (macOS-latest, stable)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (macOS-latest, stable)
The operation was canceled.
|
test (macOS-latest, nightly)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (macOS-latest, nightly)
The operation was canceled.
|
test (ubuntu-latest, 1.74)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (ubuntu-latest, 1.74)
The operation was canceled.
|
test (macOS-latest, 1.74)
The job was canceled because "ubuntu-latest_nightly" failed.
|
test (macOS-latest, 1.74)
The operation was canceled.
|
maximal-versions (macOS-latest)
The job was canceled because "ubuntu-latest" failed.
|
maximal-versions (macOS-latest)
The operation was canceled.
|
tests-from-tarball (ubuntu-latest)
Process completed with exit code 101.
|
pr-mutants (nextest)
Process completed with exit code 4.
|
pr-mutants (cargo)
The job was canceled because "nextest" failed.
|
pr-mutants (cargo)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cargo-mutants-linux
|
3.13 MB |
|
cargo-mutants-package
|
200 KB |
|
mutants-incremental-cargo.out
|
30.7 KB |
|
mutants-incremental-nextest.out
|
11.2 KB |
|