Skip to content

CI

CI #525

Triggered via schedule January 25, 2025 02:20
Status Failure
Total duration 59s
Artifacts

ci.yml

on: schedule
activate
0s
activate
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (ubuntu-22.04, 2.7)
Process completed with exit code 1.
build (windows-latest, 3.3)
The job was canceled because "ubuntu-22_04_2_7" failed.
build (windows-latest, jruby-9.4)
The job was canceled because "ubuntu-22_04_2_7" failed.
build (windows-latest, 2.7)
The job was canceled because "ubuntu-22_04_2_7" failed.
build (ubuntu-22.04, jruby-9.4)
The job was canceled because "ubuntu-22_04_2_7" failed.
build (ubuntu-22.04, jruby-9.2)
The job was canceled because "ubuntu-22_04_2_7" failed.
build (macos-latest, 3.3)
The job was canceled because "ubuntu-22_04_2_7" failed.
build (macos-latest, 3.3)
The operation was canceled.