docs: ✏️ suggestions from review
Browse files Browse the repository at this point in the history
Co-authored-by: Kris Beicher <112945740+K-Beicher@users.noreply.github.com>
  • Loading branch information
lwjohnst86 and K-Beicher authored Mar 4, 2025
1 parent 3a077fb commit effd427
Showing 1 changed file with 4 additions and 5 deletions.
9 changes: 4 additions & 5 deletions how-we-work/iteration.qmd
Original file line number Diff line number Diff line change
Expand Up @@ -50,7 +50,7 @@ Team lead sets everything up for the next two or three iterations.
iterations a few days before major holidays start.
- Will plan and decide on how long the future iterations should be
(can range from 2-6 weeks, but prefer shorter iterations over longer
ones). Currently, we find iterations with a duration of one month
ones). Currently, we find iterations with a duration of one calendar month
work the best for us. This way, we have the planning meeting at the
beginning of the month and the debrief and retrospective meeting at
the end of the month.
Expand Down Expand Up @@ -78,7 +78,7 @@ A basic agenda for the meeting might be:
- Schedule the next iteration's end and start meetings.

We usually have separate aims for each person in the team, and each of
us will add tasks to the board relevant to that aim aim as needed. This
us will add tasks to the team project board relevant to that aim aim as needed. This
usually happens as the iteration progresses.
:::

Expand Down Expand Up @@ -111,9 +111,8 @@ tasks.

Then, we agree on and schedule the end date debrief and retrospective
meeting, which should be approximately 1-2 hours and preferably before
lunch, as well as the next iterations planning meeting. The next
planning meeting should either be on the same date after lunch, to
ensure a proper break before moving to a new iteration, or the next day
lunch, as well as the next iterations planning meeting. We have found that the
planning meeting is best held the day after to ensure that we don't get too tired towards the end. Alternatively it can be the same day as the debrief, but there should be a substantial break between the two meetings.
to give some break between meetings.
:::