Skip to content

chore: cleanup

chore: cleanup #4085

Triggered via push February 3, 2025 19:29
Status Failure
Total duration 5m 26s
Artifacts 2

ci.yml

on: push
Matrix: Test
Matrix: Visual Tests
Fit to window
Zoom out
Zoom in

Annotations

22 errors
Test (latest, 18)
Process completed with exit code 1.
Test (lts/*, 18)
The job was canceled because "latest_18" failed.
Test (lts/*, 18)
The operation was canceled.
Test (lts/-1, 18)
The job was canceled because "latest_18" failed.
Test (lts/-1, 18)
The operation was canceled.
Test (lts/*, 16)
The job was canceled because "latest_18" failed.
Test (lts/*, 16)
The operation was canceled.
Test (latest, 17)
The job was canceled because "latest_18" failed.
Test (latest, 17)
The operation was canceled.
Test (lts/-1, 17)
The job was canceled because "latest_18" failed.
Test (lts/-1, 17)
The operation was canceled.
Test (lts/-1, 16)
The job was canceled because "latest_18" failed.
Test (lts/-1, 16)
The operation was canceled.
Test (latest, 16)
The job was canceled because "latest_18" failed.
Test (latest, 16)
The operation was canceled.
Test (lts/*, 17)
The job was canceled because "latest_18" failed.
Test (lts/*, 17)
The operation was canceled.
Visual Tests (20.x, 18)
Process completed with exit code 2.
Visual Tests (22.x, 18)
The job was canceled because "_20_x_18" failed.
Visual Tests (22.x, 18)
Failed to CreateArtifact: Received non-retryable error: Failed request: (409) Conflict: an artifact with this name already exists on the workflow run
Visual Tests (22.x, 18)
The operation was canceled.
Visual Tests (22.x, 18)
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
image-snapshots
1.77 MB
snapshots-diffs
347 KB