Skip to content

chore(deps): update ember #511

chore(deps): update ember

chore(deps): update ember #511

Triggered via pull request December 7, 2023 14:50
Status Failure
Total duration 15m 2s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

test.yaml

on: pull_request
Matrix: Compatibility Tests
Matrix: Floating Tests
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

17 errors
Compatibility Tests (ember-lts-4.12, @projectcaluma/ember-form)
Process completed with exit code 1.
Compatibility Tests (ember-lts-4.8, @projectcaluma/ember-distribution)
Process completed with exit code 1.
Compatibility Tests (ember-lts-4.8, @projectcaluma/ember-form)
Process completed with exit code 1.
Compatibility Tests (ember-lts-4.8, @projectcaluma/ember-form-builder)
Process completed with exit code 1.
Compatibility Tests (embroider-optimized, @projectcaluma/ember-form)
Process completed with exit code 1.
Compatibility Tests (embroider-safe, @projectcaluma/ember-form)
Process completed with exit code 1.
Compatibility Tests (embroider-optimized, @projectcaluma/ember-distribution)
Process completed with exit code 1.
Compatibility Tests (embroider-optimized, @projectcaluma/ember-analytics)
Process completed with exit code 1.
Compatibility Tests (embroider-optimized, @projectcaluma/ember-form-builder)
Process completed with exit code 1.
Compatibility Tests (ember-lts-4.8, @projectcaluma/ember-core)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 10 minutes.
Compatibility Tests (ember-lts-4.8, @projectcaluma/ember-core)
The operation was canceled.
Compatibility Tests (embroider-safe, @projectcaluma/ember-distribution)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 10 minutes.
Compatibility Tests (embroider-safe, @projectcaluma/ember-form-builder)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 10 minutes.
Compatibility Tests (embroider-safe, @projectcaluma/ember-analytics)
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 10 minutes.
Compatibility Tests (embroider-safe, @projectcaluma/ember-analytics)
The operation was canceled.