Skip to content

Update dependency ruff to v0.9.2 #86

Update dependency ruff to v0.9.2

Update dependency ruff to v0.9.2 #86

Triggered via push January 16, 2025 14:09
Status Failure
Total duration 29s
Artifacts

test.yaml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.11)
Process completed with exit code 1.
test (3.8)
The job was canceled because "_3_11" failed.
test (3.8)
The operation was canceled.
test (3.10)
The job was canceled because "_3_11" failed.
test (3.10)
The operation was canceled.
test (3.9)
The job was canceled because "_3_11" failed.
test (3.9)
The operation was canceled.