Skip to content

From patchwork series 427553 #58

From patchwork series 427553

From patchwork series 427553 #58

Triggered via push October 11, 2024 01:17
Status Failure
Total duration 27m 37s
Artifacts

powerpc-perf.yml

on: push
Matrix: perf
Fit to window
Zoom out
Zoom in

Annotations

13 errors
perf (ubuntu-18.04, ppc64)
cast to pointer from integer of different size [-Werror=int-to-pointer-cast]
perf (ubuntu-18.04, ppc64)
cast to pointer from integer of different size [-Werror=int-to-pointer-cast]
perf (ubuntu-18.04, ppc64)
Process completed with exit code 2.
perf (ubuntu-20.04, ppc64le)
The job was canceled because "ubuntu-18_04_ppc64" failed.
perf (ubuntu-20.04, ppc64le)
The operation was canceled.
perf (ubuntu-22.04, ppc64le)
The job was canceled because "ubuntu-18_04_ppc64" failed.
perf (ubuntu-22.04, ppc64le)
The operation was canceled.
perf (ubuntu-20.04, ppc64)
The job was canceled because "ubuntu-18_04_ppc64" failed.
perf (ubuntu-20.04, ppc64)
The operation was canceled.
perf (ubuntu-18.04, ppc64le)
The job was canceled because "ubuntu-18_04_ppc64" failed.
perf (ubuntu-18.04, ppc64le)
The operation was canceled.
perf (ubuntu-22.04, ppc64)
The job was canceled because "ubuntu-18_04_ppc64" failed.
perf (ubuntu-22.04, ppc64)
The operation was canceled.