Skip to content

Updated outdated deployment steps #34

Updated outdated deployment steps

Updated outdated deployment steps #34

Triggered via push May 27, 2024 12:19
Status Failure
Total duration 43s
Artifacts 1

ci.yml

on: push
Matrix: integration-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-tests (integration-dind)
Process completed with exit code 2.
integration-tests (integration-dind-ssh)
The job was canceled because "integration-dind" failed.
integration-tests (integration-dind-ssh)
The operation was canceled.
integration-tests (integration-dind-ssl)
The job was canceled because "integration-dind" failed.
integration-tests (integration-dind-ssl)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
dist Expired
255 KB