Skip to content

Added 7.1.0 changelog #25

Added 7.1.0 changelog

Added 7.1.0 changelog #25

Triggered via push May 22, 2024 16:12
Status Failure
Total duration 46s
Artifacts 1

ci.yml

on: push
Matrix: integration-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors
unit-tests (3.11)
Process completed with exit code 1.
integration-tests (integration-dind)
Process completed with exit code 2.
unit-tests (3.12)
Process completed with exit code 1.
unit-tests (3.10)
The job was canceled because "_3_11" failed.
unit-tests (3.10)
Process completed with exit code 1.
unit-tests (3.8)
The job was canceled because "_3_11" failed.
unit-tests (3.8)
Process completed with exit code 1.
unit-tests (3.9)
The job was canceled because "_3_11" failed.
unit-tests (3.9)
Process completed with exit code 1.
integration-tests (integration-dind-ssh)
The job was canceled because "integration-dind" failed.
integration-tests (integration-dind-ssh)
Process completed with exit code 2.
integration-tests (integration-dind-ssl)
The job was canceled because "integration-dind" failed.
integration-tests (integration-dind-ssl)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
dist Expired
255 KB