Skip to content

Adding test coverage for vite 6 #7549

Adding test coverage for vite 6

Adding test coverage for vite 6 #7549

Triggered via pull request February 4, 2025 12:33
@mansonamansona
synchronize #2239
test-vite-6
Status Failure
Total duration 1h 5m 10s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
lts_5_12-6.x-vite-internals ubuntu
Process completed with exit code 1.
release-6.x-vite-internals ubuntu
Process completed with exit code 1.
canary-6.x-vite-internals ubuntu
Process completed with exit code 1.
lts_5_12-vite-dep-optimizer ubuntu
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 60 minutes.
lts_5_12-vite-dep-optimizer ubuntu
The operation was canceled.
canary-vite-dep-optimizer ubuntu
The job running on runner GitHub Actions 53 has exceeded the maximum execution time of 60 minutes.
canary-vite-dep-optimizer ubuntu
The operation was canceled.
release-vite-dep-optimizer ubuntu
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 60 minutes.
release-vite-dep-optimizer ubuntu
The operation was canceled.