chore(deps): bump github.com/go-playground/validator/v10 from 10.23.0 to 10.24.0 #1825
compatibility-e2e-v2.yml
on: pull_request
Matrix: compatibility_e2e_tests
Annotations
7 errors and 1 warning
compatibility_e2e_tests (manager)
Process completed with exit code 1.
|
compatibility_e2e_tests (client)
The job was canceled because "manager" failed.
|
compatibility_e2e_tests (client)
The operation was canceled.
|
compatibility_e2e_tests (seed-client)
The job was canceled because "manager" failed.
|
compatibility_e2e_tests (seed-client)
The operation was canceled.
|
compatibility_e2e_tests (scheduler)
The job was canceled because "manager" failed.
|
compatibility_e2e_tests (scheduler)
The operation was canceled.
|
compatibility_e2e_tests (manager)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
client-e2e-tests-logs
|
10 MB |
|
dragonflyoss~dragonfly~C2ZBWR.dockerbuild
|
50.8 KB |
|
dragonflyoss~dragonfly~H79C11.dockerbuild
|
51.1 KB |
|
dragonflyoss~dragonfly~LKEOK3.dockerbuild
|
43.5 KB |
|
dragonflyoss~dragonfly~NNPOA8.dockerbuild
|
50.7 KB |
|
dragonflyoss~dragonfly~Q89SCE.dockerbuild
|
50.1 KB |
|
dragonflyoss~dragonfly~QX66NX.dockerbuild
|
43.4 KB |
|
dragonflyoss~dragonfly~TBDAYX.dockerbuild
|
43.5 KB |
|
dragonflyoss~dragonfly~YG33Z0.dockerbuild
|
44 KB |
|
manager-e2e-tests-logs
|
24.5 MB |
|
scheduler-e2e-tests-logs
|
1 MB |
|
seed-client-e2e-tests-logs
|
1 MB |
|