Skip to content

chore(deps): bump github.com/go-playground/validator/v10 from 10.23.0 to 10.24.0 #1825

chore(deps): bump github.com/go-playground/validator/v10 from 10.23.0 to 10.24.0

chore(deps): bump github.com/go-playground/validator/v10 from 10.23.0 to 10.24.0 #1825

Triggered via pull request January 27, 2025 16:00
Status Failure
Total duration 39m 9s
Artifacts 12

compatibility-e2e-v2.yml

on: pull_request
Matrix: compatibility_e2e_tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
compatibility_e2e_tests (manager)
Process completed with exit code 1.
compatibility_e2e_tests (client)
The job was canceled because "manager" failed.
compatibility_e2e_tests (client)
The operation was canceled.
compatibility_e2e_tests (seed-client)
The job was canceled because "manager" failed.
compatibility_e2e_tests (seed-client)
The operation was canceled.
compatibility_e2e_tests (scheduler)
The job was canceled because "manager" failed.
compatibility_e2e_tests (scheduler)
The operation was canceled.
compatibility_e2e_tests (manager)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
client-e2e-tests-logs
10 MB
dragonflyoss~dragonfly~C2ZBWR.dockerbuild
50.8 KB
dragonflyoss~dragonfly~H79C11.dockerbuild
51.1 KB
dragonflyoss~dragonfly~LKEOK3.dockerbuild
43.5 KB
dragonflyoss~dragonfly~NNPOA8.dockerbuild
50.7 KB
dragonflyoss~dragonfly~Q89SCE.dockerbuild
50.1 KB
dragonflyoss~dragonfly~QX66NX.dockerbuild
43.4 KB
dragonflyoss~dragonfly~TBDAYX.dockerbuild
43.5 KB
dragonflyoss~dragonfly~YG33Z0.dockerbuild
44 KB
manager-e2e-tests-logs
24.5 MB
scheduler-e2e-tests-logs
1 MB
seed-client-e2e-tests-logs
1 MB