chore: update replica version to 4ba58348 #8373
prepare-dfx-assets.yml
on: pull_request
Matrix: prepare
prepare-dfx-assets:required
0s
Annotations
5 errors
prepare (ubuntu-latest)
Canceling since a higher priority waiting request for 'Check dfx asset preparation-refs/pull/4082/merge' exists
|
prepare (ubuntu-latest)
The operation was canceled.
|
prepare (macos-13-large)
Canceling since a higher priority waiting request for 'Check dfx asset preparation-refs/pull/4082/merge' exists
|
prepare (macos-13-large)
The operation was canceled.
|
prepare-dfx-assets:required
Process completed with exit code 1.
|