Skip to content

[2201.10.x] Add PR full build check for 2201.10.x #8972

[2201.10.x] Add PR full build check for 2201.10.x

[2201.10.x] Add PR full build check for 2201.10.x #8972

Re-run triggered January 31, 2025 09:21
Status Failure
Total duration 2h 0m 26s
Artifacts 1

pull_request_full_build.yml

on: pull_request
Build Ballerina Lang
6m 36s
Build Ballerina Lang
Build Ballerina Distribution
8m 53s
Build Ballerina Distribution
Matrix: Build Stdlib Level
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Build Stdlib Level (7)
The job running on runner GitHub Actions 26 has exceeded the maximum execution time of 120 minutes.
Build Stdlib Level (7)
The operation was canceled.