Skip to content

add full matrix targets #12

add full matrix targets

add full matrix targets #12

Triggered via push November 11, 2024 14:54
Status Failure
Total duration 1m 52s
Billable time 10m
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (macos-latest, x86_64-apple-darwin)
Process completed with exit code 101.
build (windows-latest, x86_64-pc-windows-msvc, .exe)
The job was canceled because "macos-latest_x86_64-apple" failed.
build (windows-latest, x86_64-pc-windows-msvc, .exe)
The operation was canceled.
build (ubuntu-latest, x86_64-unknown-linux-gnu)
The job was canceled because "macos-latest_x86_64-apple" failed.
build (ubuntu-latest, x86_64-unknown-linux-gnu)
The operation was canceled.
build (ubuntu-latest, aarch64-unknown-linux-gnu)
The job was canceled because "macos-latest_x86_64-apple" failed.
build (ubuntu-latest, aarch64-unknown-linux-gnu)
The operation was canceled.
build (macos-latest, aarch64-apple-darwin)
The job was canceled because "macos-latest_x86_64-apple" failed.
build (macos-latest, aarch64-apple-darwin)
The operation was canceled.