Skip to content

fix link

fix link #599

Triggered via push January 1, 2025 18:42
Status Failure
Total duration 5m 27s
Artifacts

ci.yml

on: push
Matrix: base
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
base (3.13)
Process completed with exit code 255.
base (3.11)
The job was canceled because "_3_13" failed.
base (3.11)
The operation was canceled.
base (3.13)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636