Skip to content

DevGosho160/PCB_Drop_Test_Labview

Repository files navigation

Data Acquisition - PCB Drop Test

Run instructions

  1. Pressurize system
  2. Place safety pin into Touch Test
  3. Turn Touch Test on
  4. Connect trigger banana pins to DMM(Voltage measurement)
  5. Make sure PXIe is on
  6. Configure auto operation: number of drops, drop height, and set a rest period of 75 seconds
  7. Open DataAcquisition.vi in PCBDropTestSystem folder
  8. Set the number of drops and add the filepath of the output file to the path textbox. The final element of the filepath must be a .lvm file (C:\Users\localuser\Documents\data.lvm)
  9. Turn trigger and BK Meter on
  10. Start DataAcquisition.vi
  11. Start Auto Operation
  12. Run Tests
  13. After VI stops, turn off the trigger, Touch Test, and BK Meter, put safety pin away
  14. Depressurize the system

About

No description, website, or topics provided.

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages